Hanzebridge near Zwolle – Hanzelijn

2016-12-27T18:26:38+01:00

Hanzebridge in Hanze railway track near Zwolle Inspectation bv, a part of the VolkerWessels holding has given an assignment to 3DGeoMapping to inspect the Hanzebrug in the Hanzespoorlijn between Zwolle and Hattum. 3DGeoMapping was using drones for this assignment. The bridge crosses the river IJssel as wel to bypasses who [...]

Circulair economy location Attero bv at Wilp

2016-12-27T18:29:46+01:00

Circulair economy location Attero at Wilp Commissioned by Attero bv, 3DGeoMapping has taken images from the stock remaining raw materials with a drone and then converted the data into a 3D model. This model is the starting point for the next yearly quarter recording and measurement. Attero needs better and consistent calculations of the [...]

Reconstruction Nieuweweg Tienhoven

2016-12-27T18:28:42+01:00

Reconstruction Nieuweweg Tienhoven A contractor has given 3DGeoMapping the assignment to make at the start of the work pictures from the existing situation and made a 3D model of this situation. including the road and the embankment on which the road was built. After realisation of the work 3DGeoMapping will again take pictures to [...]

CE plant Van Gansewinkel at Stadskanaal

2016-12-27T18:29:00+01:00

CE plant Van Gansewinkel Stadskanaal For the Circulair Economy depots Gansewinkel is determined using drone for mapping the various depots. Using the 3D model various depots and storage areas can be calculated separately. With a frequency measurement scheme commodity storms can be identified and used to support monthly and quarterly [...]

Go to Top